Blamar Group
cbm
cat | esp | eng | fra
Youtube Twitter

News

18/07/12

Caldea

Caldea

Caldea

In early 2012 CBM started its handrail production and installation project along with Serraleria els Cortals i Cricursa.

The first phase consisted in the production the LED illuminated railing on the bridge that leads to the thermal centre. Stainless steel uprights with clamps for curved glass.

The second phase is the construction of the stainless steel interior walkway. A part from building the railing CBM was commissioned to build the structure thanks to the team of architects who are part of the CBM staff.

The third phase consists in the production of balustrades and handrails for the outside of Caldea 2 and the Inúu area.

« Back to home